UHN Cardiac Upgrade Phase 3; Prince George BC
Project Files
Drawings & Specifications
specs_phase3_20250428_IFC arch_uhn_cardi_144320012_PH3_drawings_IFC mech_uhn_cardi_144320012_PH3_drawings_IFC elec_uhn_cardi_144320012_PH3_drawings_IFCAddendums
UHN Cardiac Diagnostic Dept Upgrade Phase 3 IFT_Addendum 1 UHN Cardiac Diagnostic Dept Upgrade Phase 3 IFT Addendum #2 -2025.02.25 UHN Cardiac Diagnostic Dept Upgrade Phase 3 IFT Addendum #2 LEVEL 1 - FINISHES FLOOR PLAN - 2025.02.26 UHN Cardiac Diagnostic Dept Upgrade Phase 3 IFT Addendum #2 Electrical drawing - 2025.02.26 UHN Cardiac Diagnostic Dept Upgrade Phase 3 IFT Addendum#3-2025.03.03 UHN Cardiac Diagnostic Dept Upgrade Phase 3 IFT Addendum#4-2025.03.04Project Overview
The attached information is being provided for your convenience only. VECTOR PROJECTS GROUP LTD. WILL NOT BE HELD LIABLE OR RESPONSIBLE IN ANY WAY FOR ANY INACCURACY, MISSING INFORMATION OR MISSING ADDENDUMS. Responsibility rests solely with sub trades and suppliers to independently confirm that they have all the information needed to assess the requirements of the full and complete contract documents.
Disclaimer
The attached information is being provided for your convenience only. VECTOR PROJECTS GROUP LTD. WILL NOT BE HELD LIABLE OR RESPONSIBLE IN ANY WAY FOR ANY INACCURACY, MISSING INFORMATION OR MISSING ADDENDUMS. Responsibility rests solely with sub trades and suppliers to independently confirm that they have all the information needed to assess the requirements of the full and complete contract documents.