UHN DI CT 64 Replacement Prince George Closes 2:00 Sept.21,2026 PDT
Project Files
Drawings & Specifications
IFT ARCH - 2026.08 - TAD - ARCH SPEC IFT ARCH - 2026.08 - TAD - ARCH DWGS IFT MECH - 2026.08 - ApertaEngineering - MECH SPEC IFT MECH - 2026.08 - ApertaEngineering - MECH DWGS IFT ELEC - 2026.08 - OMEngineering - ELEC SPEC IFT ELEC - 2026.08 - OMEngineering - ELEC DWGS_R1 IFT STRU - 2026.08 - RJCEngineering - STRU DWGS_R1 BC-1372_Invitation to Bid & Front End Documents 2026.03_T&T OHS_Pre-Renovation Hazardous Materials Survey 2026.03_T&T OHS_Asbestos Bulk Sample Report 4.0 Construction Toolkit BinderAddendums
BC-1372_CT-SCAN_Add01_2026-08-28b2Project Overview
Replacement of a pre-existing CT machine (by others) and refinishing of the CT room and the adjacent Control Rooms.
Project Location
The attached information is being provided for your convenience only. VECTOR PROJECTS GROUP LTD. WILL NOT BE HELD LIABLE OR RESPONSIBLE IN ANY WAY FOR ANY INACCURACY, MISSING INFORMATION OR MISSING ADDENDUMS. Responsibility rests solely with sub trades and suppliers to independently confirm that they have all the information needed to assess the requirements of the full and complete contract documents.
Disclaimer
The attached information is being provided for your convenience only. VECTOR PROJECTS GROUP LTD. WILL NOT BE HELD LIABLE OR RESPONSIBLE IN ANY WAY FOR ANY INACCURACY, MISSING INFORMATION OR MISSING ADDENDUMS. Responsibility rests solely with sub trades and suppliers to independently confirm that they have all the information needed to assess the requirements of the full and complete contract documents.